Trail Restoration on Petroglyph Canyon Trail
October 31 @ 9:00 am - 12:00 pm

Join the BLM and Friends of Sloan Canyon for a morning of repairing switchbacks on the Petroglyph Canyon Trail. Early August, Sloan Canyon received a lot of rain resulting in some trail damage. Join us to repair these switchbacks by rocks lining the trail, raking out the trail, and more. This project will require at least 0.5 miles of hiking.

